ActiveGanttCSN Scheduler Component icon

ActiveGanttCSN Scheduler Component

2 big stars
ActiveGanttCSN Scheduler Component screenshot
Name: ActiveGanttCSN Scheduler Component
Works on: windowsWindows ME and above
Version: 2.9
Last Updated: 15 Feb 2017
Release: 03 May 2013
Category: Programming
Rate this software:
229 downloads
screenshotsView Screenshots(2)
commentsComments
downloadDownload
Liked it? Tell others:
details

ActiveGanttCSN Scheduler Component Details

Works on: Windows 10 | Windows 8.1 | Windows 8 | Windows 7 | Windows XP | Windows 2000 | Windows 2003 | Windows 2008 | Windows ME | Windows Vista | Windows 2012
SHA1 Hash: fab38ebb0117cf47703fea144b5a8b589b3c8c20
Size: 10.21 MB
File Format: zip
Rating: 2.0 out of 5 based on 23 user ratings
Downloads: 229
License: Demo / Trial Version
ActiveGanttCSN Scheduler Component is a demo software by The Source Code Store Llc and works on Windows 10, Windows 8.1, Windows 8, Windows 7, Windows XP, Windows 2000, Windows 2003, Windows 2008, Windows ME, Windows Vista, Windows 2012.
You can download ActiveGanttCSN Scheduler Component which is 10.21 MB in size and belongs to the software category Programming.
ActiveGanttCSN Scheduler Component was released on 2013-05-03 and last updated on our database on 2017-02-15 and is currently at version 2.9.
download button
Thank you for downloading from SoftPaz! Your download should start any moment now. It would be great if you could rate and share:
Rate this software:
Share in your network:
features

ActiveGanttCSN Scheduler Component Description

Add Gantt chart and scheduling capabilities to your .NET Windows Forms application. ActiveGanttCSN can be used with practically any development environment and .NET language (VB.NET, managed C++, etc.) that supports .NET Windows Forms.Use ActiveGanttCSN to build Gantt Charts, rosters, equipment/location rental, TV/Movie scheduling, and many other applications.Features:ActiveGanttCSN is an easy to use Gantt chart component. ActiveGanttCSN has an easy to understand object hierarchy. The object model is consistent across all the other programming language / technology versions of the component (ActiveGanttVBN, ActiveGanttCSW, etc.), so there is no need to learn a new object model when switching project types.ActiveGanttCSN has an integrated Treeview that can be used to represent a Work Breakdown Structure (WBS). ActiveGanttCSN can also be used in Grid Mode with Columns, Rows and Cells, like in a spreadsheet program.ActiveGanttCSN has limitless levels of zoom in the timeline. The timeline is completely customizable.ActiveGanttCSN has snap to grid capabilities and fully customizable tool tips for easy date selection or retrieving task information.Conflict detection can be turned on or off in ActiveGanttCSN. Tasks and Milestones can be arranged in multiple layers.ActiveGanttCSN can import Microsoft Project 2003, 2007 and 2010 XML files.ActiveGanttCSN supports GDI+ graphics and has an open source printing method in C#.ActiveGanttCSN is locale customizable and Unicode compliant. ActiveGanttCSN can use different character sets such as Arabic, Cantoneese, Bengali, Greek, Hebrew, Hindi, Japanese, Korean, Russian, Thai, etc., using the appropiate font (such as Arial Unicode MS).ActiveGanttCSN is available in a compiled state or in professional and well documented C# source code.The ActiveGanttCSN trial version has no expiration date and is not crippled in any way.
currency

Where to buy?

Last updated price and discount information 6 years agoupdate now
$USD290.00Click the link to buy
screenshots

ActiveGanttCSN Scheduler Component Screenshots

ActiveGanttCSN Scheduler Component screenshot 1 ActiveGanttCSN Scheduler Component screenshot 2